My Husband, brother and his two friends, 1 is a plumber and the other a tile setter took on the task of a total gut job. We closed off the back bathroom door and redesigned the small bathroom. Project took longer than we anticipated due to a serious health issue, our friend who does the tile had. We started tearing off old tiles and wall mid Aug and finished the project mid Oct, thanks to our neighbors who let us use their bathrooms! I must admit I had no idea how expensive bathroom material cost and I have that champagne taste on a beer budget. I ended up with a glass shower door with what they called a rain look, so I had a cabinet in the room with a louver door, that I repurposed by finding a glass CO. who was able to match up the glass to look like the shower door. I also had a steel frame door that I wanted to look like wood, so I mixed stain, paint and glaze to achieve the wood look. The wood tool did not work, so I used brush strokes to get the look and also use it for the cabinet trim, floor trim and floor vent. and the window trim, which I then polyurethaned. After sealing off the back bathroom door, I had to come up with something to cover the new wall and I knew I would not be able to match up the faux paint job done 12 years ago, so I saw these faux brick panels at Menards for $25.00 each I purchased 6 of them and did one wall first in my living room, which I posted on Hometalk a month or so ago. I also took the two drawers from the old bathroom vanity and made shadow boxes out of them by spray painting and adding some material to the inside. The little sitting room I have in the back of the house needed a pop of color and they turned out just fine. I hope you like my remodel, we are thrilled with the out come.
Time: 2 Months Cost: $7500 Difficulty: Advanced
  • bathroom remodel
We started by gutting areas of the bathroom at a time, so we didn’t have to order a dumpster.
  • bathroom remodel
Louver door that probably had 5 or more coats of different paint on it….I tired to remove it, but I couldn’t get it all off so we sawed off all the slates and sanded it down.
  • bathroom remodel
We took out the old vanity and medicine cabinet, gutted the area to the studs.
  • bathroom remodel
for over a month in a half all we had in there was the shower. Our tile friend, lost a son, had heart surgery and then his back went out. This really delayed the project, but we survived, thanks toour neighbors who let us use their shower.
  • bathroom remodel
Prepping the new shower area
  • bathroom remodel
Put plastic up to contain the heat from the attic and going throught the rest of the house…It was in the high 90’s
  • bathroom remodel
As you can see we sealed off that back door and built a wall to cover it, we used some 2×4 before the drywallers came, we also reinforced parts of the walls for the grab bars…we also put concrete and rubber floor pan before tiling.
  • bathroom remodel
Completion of shower
  • bathroom remodel
completion of inside shower
  • bathroom remodel
staind the window frame dark and put a stained glass in the window for a pop of color in the shower to break up all the beige, brown, tan colors…glass stain piece was purchased at overstock.com…. Chloe Tiffany-style Victorian Design Round Window Panel
  • bathroom remodel
I went to a glass and mirror CO called Chatham and had a glass made for the louver cabinet that was there, after taking out the louvers and sanding, I made up a stain, paint and glaze mixture to give the wood a dark almost burnt look, which I also used on the metal door frame to make that look like wood and then I did all the floor trim & floor register…polyurethaned everything for protection to moisture.
  • bathroom remodel
Everything put back together, picked out a bold green color for the walls (Tansey Green) Sherwin Williams…I did receive some negative comments from family and friends, but if you ever saw their homes, you can tell they have no vision…lol to each their own.
  • bathroom remodel
The original back door to the bathroom that was sealed off
  • bathroom remodel
Used a faux brick paneling to cover the the new wall and the existing back wall, I knew I would never be able to recreate the faux finish on the walls in the den. After that was done I definitely needed a pop of color. I had those two paintings in another room.
.
  • bathroom remodel
I used the two drawers from the old bathroom vanity to make shadow boxes, I spray painted the out side a turqoise, put two new door knobs and spray painted the inside white…needed a little something, so I had material left from the pillow and I cut to pieces out to fit the back and glue them with a spray glue…Wah La…I also made them a keep sake, in one box I put a picture of my father and his old spice shaving mug with original brush, cleaning tool and shavers, there’s even an unopened box of razors….In the other box I have a picture of my mother and father when they were first married and I have a small vase of dried flowers from their funerals, they still smell wonderful.

Materials I used for this project:

Hometalk may collect a small share of sales from the links on this page.

Prices updated as of November 13, 2017 8:34 AM – More info